None of the existing pilots for the innovation credit apply – for a specific certification project, the detailed data will be provided
Façade Contractor ask for a rectification of this quality issue.
- 1.
Подрядчик по фасадным работам просит/попросил уточнить спорный вопрос о качестве.
Traducción agregada por Tatiana OsipovaOro en-ru
according to WB design assumptions, an additional factor of 1.15 has been considered for the dead load of the steel in order to take into account connections and stiffners.
краска вспучилась (отслоилась, вспузырилась)
я больше склоняюсь к мнению...
- 1.
I tend to lean more towards the view that...
Traducción agregada por Andrew GalatinPlata ru-en - 2.
I'm inclined to think ...
Traducción agregada por Tatiana GerasimenkoOro ru-en - 3.
I tend to think that...
Traducción agregada por Руслан ЗаславскийOro ru-en
A separate EPDM joint does not affect the technical application of the design intent.
EPDM joints
keders
- 1.
Кедер- канты
Traducción agregada por Yuri DDDBronce en-ru
Application reinforcement
ETFE
- 1.
ЭТФЭ-полимер
Traducción agregada por Yuri DDDBronce en-ru