about icon-addNote android4 Answer apple4 icon-appStoreEN icon-appStoreES icon-appStorePT icon-appStoreRU Imported Layers Copy 7 icon-arrow-spined icon-ask icon-attention icon-bubble-blue icon-bubble-red ButtonError ButtonLoader ButtonOk icon-cake icon-camera icon-card-add icon-card-calendar icon-card-remove icon-card-sort chrome-extension-ru chrome-extension-es-mx chrome-extension-pt-br chrome-extension-ru comment comment icon-cop-cut icon-cop-star Cross Dislike icon-editPen icon-entrance icon-errorBig facebook flag flag_vector icon-globe icon-googlePlayEN icon-googlePlayRU icon-greyLoader icon-cake Heart 4EB021E9-B441-4209-A542-9E882D3252DE Created with sketchtool. Info Kebab icon-lamp icon-lampBig icon-learnHat icon-learning-hat Dislike Loup Loup icon-more icon-note icon-notifications icon-pen Pencil icon-play icon-plus-light icon-plus icon-rosie-cut Rune scrollUp Share-icon Shevron-Down Shevron Left Shevron Right sound sound1 sound2 sound3 sound4 sound2 icon-star Swap icon-translate Trash icon-tutor-ellipsis icon-tutor-flip Tutor folder icon icon-tutor-learned icon-twoWayArrow Mezhdunarodny_logotip_VK vk icon-word pen_icon Logo Logo Logo

Examples from texts

The frequency of the 16,7 Hz electric traction system (except for synchronous- asynchronous converter) is not imposed by the three-phase grid.
La fréquence du système de traction électrique 16,7 Hz (à l'exception du convertisseur synchrone-asynchrone) n'est pas imposée par la grille triphasée.
The procedure for situating the vehicle relative to the grid is specified in Annex III;
La méthode permettant de situer le véhicule par rapport aux trois plans est indiquée à l'annexe III;
The catchment area of the river La Gartempe, from the sources to the dam (with a grid) of Saint Pierre de Maillé in the department of La Vienne
le bassin de la Gartempe, depuis les sources jusqu'au barrage (doté d'une grille) de Châtellerault (Vienne),
Expands the borders of the selected element to the nearest grid lines.
Étend les bordures de l'élément sélectionné sur les lignes de grille les plus proches.
ABBYY FormDesigner 8.0ABBYY FormDesigner 8.0
BYY FormDesigner 8.0
ABBYY FormDesigner 8.
© 2008 ABBYY
BYY FormDesigner 8.0
ABBYY FormDesigner 8.
© 2008 ABBYY
The framework is a 2 x 4 grid that dissects the environment into size (micro and macro) by type (physical, economic, political, and sociocultural).
Le cadre est une grille de deux cases sur quatre qui dissèque l'environnement en dimensions (micro et macro) selon le type (physique, économique, politique et socioculturel).
© 1996-2010, Institut canadien d'information sur la santé (ICIS)
© 1996-2010, Canadian Institute for Health Information (CIHI).
Small power plants would primarily serve local customers but could be connected to the larger grid.
Les petites centrales électriques ont une clientèle avant tout locale mais peuvent être reliées au réseau d'ensemble.
The complexity rating system consists of an objective grid in which various factors are assigned point values.
Le système d'évaluation de la complexité comporte une grille objective attribuant une valeur numérique à divers facteurs.
Connection and reinforcement of the grid in Madeira (PT)
Connexion et renforcement du réseau dans l'île de Madère (P)
The critical load vaiuefor a given grid square is the 5th percentile value for all lakes located within the square.
La charge critique pour un carré correspond à la valeur du 5e centile pour tous les lacs se trouvant dans le carré.
diversifying sources of supply and entry points, including the LNG connections with the transmission grid.
diversification des sources d'approvisionnement et des points d'entrée, y compris les connexions GNL avec le réseau de transport.
Clean Current Power Systems will demonstrate its novel, highly efficient commercial scale tidal turbine that converts the energy of tidal currents into grid ready electricity.
Clean Current Power Systems Ltd. fera la démonstration de sa turbine marémotrice commerciale extrêmement efficace qui convertit l'énergie des courants de marée en électricité prête à être distribuée.
© 2012 Technologies du développement durable Canada
© 2012 Sustainable Development Technology Canada
Place an X at each grid intersection.
3.Tracez une croix sur chaque intersection de la grille.
© 2012 Wacom Company, Limited
http://wacom.eu 1/11/2012
© 2012 Wacom Company, Limited
http://wacom.eu 1/11/2012
-1 % VOC), the model simulations show a decrease in the calculated frequency of grid hours exceeding the threshold of ground-level ozone concentrations of 180 >ISO_7>ì>ISO_1>g/m3 by approx. 14 %.
1 % de COV), les simulations du modèle montrent une diminution d'environ 14 % de la fréquence calculée des heures de dépassement sur grille où le seuil de concentration d'ozone au sol de 180 >ISO_7>ì>ISO_1>g/m3est franchi.
-32 % VOC), the simulation shows a 29 % decrease of the calculated number of grid hours with ground-level ozone concentrations above 180 >ISO_7>ì>ISO_1>g/m3.
32 % de COV), la simulation met en évidence une diminution de 29 % du nombre d'heures de dépassement sur grille où les concentrations d'ozone au sol excèdent 180 >ISO_7>ì>ISO_1>g/m3.
A negative exceedance indicates that the estimate of current deposition is less than the grid cell critical load.
Les valeurs négatives signifient que la valeur estimée du dépôt est inférieure à la charge critique pour cette maille.

Add to my dictionary

Not found

User translations

No translations for this text yet.
Be the first to translate it!

Collocations

grid pattern
quadrillage
grid coordinate system
système de carroyage
grid north
nord de la grille
military grid
carroyage militaire

Word forms

grid

noun
SingularPlural
Common casegridgrids
Possessive casegrid'sgrids'